Home > Products >
Transformer Test Bench
>
High Voltage Transformer Comprehensive Test Bench for 110kV, 220kV and 500kV Power Transformers – Advanced Automatic Transformer Testing System

High Voltage Transformer Comprehensive Test Bench for 110kV, 220kV and 500kV Power Transformers – Advanced Automatic Transformer Testing System

Product Details:
Place of Origin: China
Brand Name: Sansion
Certification: CE SGS ISO9001
Model Number: SXBP
Detail Information
Place of Origin:
China
Brand Name:
Sansion
Certification:
CE SGS ISO9001
Model Number:
SXBP
Control:
Computer Control
Load Way:
Electronic Load
Power Supply:
AC 220V ±10%, 50/60Hz
Regulator Capacity:
400kVA Continuous Adjustable Output
Rated Power:
162 KVA
Dimensions:
800mm X 600mm X 1200mm
Test Functions:
Transformer Turns Ratio, Vector Group, Winding Resistance, No-load Loss, No-load Current, Load Loss, Short-circuit Impedance, Power-frequency Withstand, Induced Voltage Test, Insulation Resistance, Capacitance And Tan Delta, Temperature Rise Testing
Test Sequence:
Routine Test Workflows, Test Sequence Management, Transformer Nameplate Information, Automatic Measurement, Automatic Calculations, Data Storage, Report Generation, Test Record Traceability
Highlight:

High Light

Highlight:

110kV power transformer test bench

,

220kV automatic transformer testing system

,

500kV high voltage transformer test bench

Trading Information
Minimum Order Quantity:
1
Packaging Details:
plywood case
Delivery Time:
30 work days
Payment Terms:
L/C,T/T
Product Description
Product Description

The High Voltage Transformer Comprehensive Test Bench is engineered for comprehensive testing of high-voltage power transformers.

For large transformers, the system cannot be selected simply according to the rated voltage. Engineers must consider transformer capacity, test voltage, test current, impedance, winding configuration, factory power supply and required test standards.

Testing Functions
  • Transformer ratio test
  • Vector group test
  • DC winding resistance
  • No-load loss
  • No-load current
  • Load loss
  • Short-circuit impedance
  • AC withstand voltage
  • Induced voltage test
  • Insulation resistance
  • Capacitance and dielectric loss
  • Partial discharge testing
  • Temperature rise testing
  • Optional impulse testing

Comprehensive transformer test systems can be configured with additional tests beyond the basic ratio/resistance/no-load/load package.

High-Voltage Project Applications

Suitable for:

  • 110kV power transformers
  • 220kV power transformers
  • 330kV power transformers
  • 500kV power transformers
  • Large-capacity power transformers
  • Transformer manufacturing plants
  • High-voltage testing laboratories
Important Selection Parameters

When purchasing a high-voltage transformer test bench, customers should consider:

  • Transformer rated voltage
  • Transformer capacity
  • Required test voltage
  • Maximum test current
  • Transformer capacitance
  • Test frequency
  • Factory power capacity
  • Required test items
  • Test room dimensions
  • Safety interlock requirements
FAQ

Q: Can you provide a test bench for 110kV or 220kV transformers?
Yes. The system can be engineered according to the actual transformer test requirements.

Q: Does a higher transformer voltage always require a larger test system?
Not necessarily. The required test system depends on several electrical parameters, not only the rated voltage.

Q: Can the equipment be designed for large transformer factories?
Yes. Large-capacity transformer test systems can be engineered as complete factory testing solutions.

Q: Can installation and commissioning be provided?
For large customized projects, installation, commissioning and operator training can be included according to the project scope.