2026-03-23
Technical Insight: Resolving Thermal Disturbances in FAT![]()
In Distribution Transformer Factory Acceptance Testing (FAT), no-load loss and load loss are the core metrics for evaluating energy efficiency. However, many manufacturers frequently encounter the issue of inconsistent loss data during the testing process.
This deviation is typically not caused by structural defects in the transformer itself, but rather by the physical drift of winding DC resistance at varying ambient temperatures, combined with the time lag and human reading errors inherent in manual correction.
Pain Points: Winding Temperature & Loss Conversion
According to IEC 60076 standards, measured loss values must be corrected to a reference temperature (typically 75°C or 85°C). In traditional testing workflows, technicians often face data distortion due to:
The Solution: Automated Temperature Compensation in Test Benches
To eliminate thermal interference during FAT, modern Transformer Test Benches utilize multi-point thermocouple acquisition combined with real-time algorithmic compensation. This technology enables parametric control:
Industry Procurement Guide:
For enterprises purchasing FAT equipment, it is recommended to prioritize test stations equipped with Automated Data Logging and embedded standard correction formulas. This not only bypasses human computational errors but also provides utility owners with traceable, verified compliance reports.